Construction of 1no. 2500A and 1no. 2 x 1250A MV, and 106nos. ATS Panels at TESLEE PALM ESTATE, for M R B MAITAMA, ABUJA.
2,500A MV Panel with 9nos. 1000A , 4pole motorized MCCB. Metered with Digital metering for Volts, Current. PF, HZ and KWH
Completed construction of Panels into standard Enclosure of IP 55, for M R B, at TESLEE PALM ESTATE, MAITAMA, ABUJA
FEEDER PILLAR, with 800A Incomer and 12nos. 100A MCCB, out-goings under construction. Signal control circuits for the individual duplexes
8nos. of ATS panels and 8nos. of Pre-paid meter housed into one 2000 x 800 x 600mm IP55 enclosure at Dalhatu Bayero Estate Wusa II, Abuja
33KV OUT-DOOR CIRCUIT BREAKER Installed (OUT-DOOR CIRCUIT BREAKER) at Dalhatu Bayero Estate Wusa II, Abuja
MAXKAS ENGINNEER constructing 1250A MV Panel, for M R B, at TESLEE PALM ESTATE, MAITAMA, ABUJA
Terminated 3 x 800A, 4pole MCCB outgoing Breakers for M R B, at TESLEE PALM ESTATE, MAITAMA, ABUJA
Floor conduit piping for Public Address System at the Auditorium of Ministry of Foreign Affairs HeadQuarter, Abuja
2MVA, 11/0.415KV Transformer Installed with External Cabling at TESLEE PALM ESTATE. for M R B, FTC, Abuja
The Technical Director, with Staff Terminating the Thermal Heat Exchanger Control Panel, at Ashakace PLC, for MANTRAC
The Technical Director on Final check on the 11KV Double Bus Bar Panel Installed at Ashakacem PLC, For MANTRAC
The Technical Director posing with the installed HEAT EXCHANGER Pumps and Sensors at ASHAKACEM PLC, for MANTRAC
Wiring of Internal Lighting of the NGERIAN LAW SCHOOL MULTI-PURPOSE HALL, BWARI. With HF 4 x 18W Modular fitting and 26W Down lighters
Wiring of Entrance Lighting of the NGERIAN LAW SCHOOL MULTI-PURPOSE HALL, BWARI with special fluorescent Down Lighters
Walk way Lighting of the NGERIAN LAW SCHOOL MULTI-PURPOSE HALL, BWARI. With 2 x 36W Enclosed fluorescent fittings
630A, Incomer with 30 x 63A Outgoings MV Panel constructed and installed at the NIGERIAN LAW SCHOOL MULTI-PURPOSE HALL, BWARI
Construction and Installation of Cable tray work for Internal Electrical wiring at the MINISTRY of FOREIGN AFFAIRS, HQ. ABUJA
6M high SOLAR PERIMETER LIGHT Installation for ALPHA-PRAXIS Limited, at the MINISTRY of FOREIGN AFFAIRS, HQ. ABUJA
Constructed and Installed of 1250KVA, 2x1600A MV panel, ATS panels of 4bedroom duplex at SHEKINAH GREEN Estate, Abuja
SM6 36 Panel with the Trickle Unit were Supplied and installed at SHEKINAH GREEN ESTATE ESTATE, APO, ABUJA
AUTOMATIC MAIN FAILURE Panel Constructed for ASO GARDEN ESTATE, KARSANA DISTR KUBWA
3nos. 500KVA Transformers Installation at Lugbe new AMAC Market, Abuja
Construction and Installation of 33KV Overhead Line to Lugbe new AMAC market, Abuja
3nos. 2 x 1600A MCCB MV Panel constructed for CARTER’s COURT ESTATE, APO, ABUJA
6nos. 36KW Pump & 18KW Pump for SIXXICO OIL DEPORT at ORON, AKWA-IBOM STATE
MV Panel Constructed for SIXXICO OIL DEPORT at ORON, AKWA-IBOM STATE
Internal and external wiring for AGR at Naval College Onne, Port Harcourt, Rivers State
10MVA Transformer delivered for Karsana Estate Kubwa, Abuja
LV Panel and 7nos. 63A Change Over switch for 6nos. Terrace at Guzape, Abuja